VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.

Commissioning

Review commissioning readiness, task dependencies, required evidence, and dummy factory/site acceptance work for the selected deployment.

Readiness
62%
Evidence
52%
Tasks
21
Blocked
1
Evidence gaps
3

Commissioning Gantt

Factory acceptance, site acceptance, integrated systems test, and evidence review.

Group / activity
Nov 14, 2026
Dec 1, 2026
Dec 19, 2026
Jan 6, 2027
Jan 24, 2027

Task List

Evidence and owner role for seeded commissioning tasks.

Task
Group
Owner
Readiness
Evidence
basis of design review - Backup Generation Module
BACKUP_GENERATION
L0 Design and Planning
Factory QA
ready
complete
commissioning script authoring - Controls and Telemetry Module
CONTROLS_TELEMETRY
L0 Design and Planning
Factory QA
ready
complete
risk and method statement - Security and Network Module
SECURITY_NETWORK
L0 Design and Planning
Factory QA
ready
complete
factory visual inspection - FLEX Logistics Yard Module
FLEX_LOGISTICS_YARD
L1 Factory Testing
Factory QA
ready
complete
factory controls simulation - FLEX Water Treatment Module
FLEX_WATER_TREATMENT
L1 Factory Testing
Factory QA
ready
complete
factory witness evidence pack - FORGE High Density UPS Module
FORGE_UPS
L1 Factory Testing
Factory QA
ready
complete
delivery condition check - Security and Network Module
SECURITY_NETWORK
L2 Delivery, Installation, Pre-Start
Commissioning
in-progress
complete
installation verification - Facility Support Module
FACILITY_SUPPORT
L2 Delivery, Installation, Pre-Start
Commissioning
ready
complete
pre-start safety check - Structural Kit Module
STRUCTURAL_KIT
L2 Delivery, Installation, Pre-Start
Commissioning
ready
complete
energisation sequence - FORGE High Density UPS Module
FORGE_UPS
L3 System Start-Up
Commissioning
in-progress
complete
controls point-to-point - FORGE Liquid Distribution Module
FORGE_LIQUID_DISTRIBUTION
L3 System Start-Up
Commissioning
ready
complete
cooling loop fill and flush - FORGE Heat Rejection Module
FORGE_HEAT_REJECTION
L3 System Start-Up
Commissioning
ready
complete
normal mode functional test - Structural Kit Module
STRUCTURAL_KIT
L4 Functional Performance Testing
Commissioning
in-progress
complete
failure mode functional test - Power Distribution Module
POWER_DISTRIBUTION
L4 Functional Performance Testing
Commissioning
ready
open
alarm and trend validation - Fire and Life Safety Module
FIRE_LIFE_SAFETY
L4 Functional Performance Testing
Commissioning
ready
complete
utility failure IST - FORGE Heat Rejection Module
FORGE_HEAT_REJECTION
L5 Integrated Systems Testing
Operations
in-progress
complete
thermal step-load IST - FORGE AI Server Hall Module
FORGE_AI_SERVER_HALL
L5 Integrated Systems Testing
Operations
blocked
open
life-safety integration IST - FORGE BESS Buffer Module
FORGE_BESS
L5 Integrated Systems Testing
Operations
ready
complete