VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.
exceptionFLEXFLEX R1.0APAC

Configuration Workspace

Build a deployment configuration from product family, release, global baseline, Regional MVP, and approved variants. Strategy is selected through explicit approved strategy variants.

Open procurementOpen inventory
Modules
11
Resolved selection
Parts
232
SKUs
504
Variants
3
Approved bundles
Drag orbit · wheel zoom · shift drag pan

Deployment Configuration Inputs

Select the governed content that resolves the deployment configuration.

Approved Variants

Regional, customer, and strategy variants are explicit governed bundles.

Regional Variants

Customer Variants

Strategy Variants

global baseline
$610.5k/MW
72 MW · $44m total
regional MVP
$636.5k/MW
74 MW · $47.1m total
approved variants
$641.6k/MW
77 MW · $49.4m total
deployment configuration
$664.1k/MW
77 MW · $51.1m total

Classification

Standard, approved variant, or exception state for this deployment configuration.

exception
FLEX APAC Deployment Configuration
FLEX R1.0 Global Baseline + FLEX R1.0 APAC Regional MVP + 3 approved variant bundles.
Rule reasons
Europe, Middle East, and Africa variant does not match the selected Regional MVP region APAC.
Warnings
2 selected modules are not fully ready.
56 selected SKUs have high inventory risk.
168 selected SKUs have lead time at or above 20 weeks.
Triggered rules
Regional variant must match Regional MVP
region and country effectivity

Europe, Middle East, and Africa variant does not match the selected Regional MVP region APAC.

Approved alternatives
  • Select the matching regional variant or change the Regional MVP.
In-progress module readiness
exception triggers

2 selected modules are not fully ready.

Affected modules: Medium-Voltage Intake Module, Fire and Life Safety Module
Approved alternatives
  • Use the prior approved module revision or hold for readiness update.
High-risk SKU warning
inventory warnings

56 selected SKUs have high inventory risk.

Approved alternatives
  • Review approved alternate SKUs with lower lead-time risk.
Long-lead exposure warning
lead-time warnings

168 selected SKUs have lead time at or above 20 weeks.

Approved alternatives
  • Review cross-region shippable alternatives or earlier procurement reservation.
Exception state requires deviation review before this deployment configuration can proceed.

Selected Modules

Module set resolved from global baseline, Regional MVP, and variant effects.

Medium-Voltage Intake Module
MV_INTAKE · revision 1.1.0
sharedin-progress
Backup Generation Module
BACKUP_GENERATION · revision 1.0.0
sharedready
Controls and Telemetry Module
CONTROLS_TELEMETRY · revision 1.0.0
sharedready
Security and Network Module
SECURITY_NETWORK · revision 1.0.0
sharedready
Facility Support Module
FACILITY_SUPPORT · revision 1.0.0
sharedready
Structural Kit Module
STRUCTURAL_KIT · revision 1.1.0
sharedready
Power Distribution Module
POWER_DISTRIBUTION · revision 1.0.0
sharedready
Fire and Life Safety Module
FIRE_LIFE_SAFETY · revision 1.0.0
sharedin-progress
FLEX UPS Module
FLEX_UPS · revision 1.0.0
FLEXready
FLEX Cooling Generation Module
FLEX_COOLING_GENERATION · revision 1.0.0
FLEXready
FLEX Heat Rejection Module
FLEX_HEAT_REJECTION · revision 1.1.0
FLEXready

Cost Bridge

$664.1k/MW · $51.1m total · 77 MW

global baseline
FLEX R1.0 Global Baseline
$43,955,386
10 baseline modules
regional MVP
FLEX R1.0 APAC Regional MVP
$3,145,099
10 Regional MVP decisions
approved variants
3 approved variant bundles
$2,304,000
12 variant effects
deployment configuration
Final deployment configuration resolution
$1,729,157
Resolution allowance for final content, revision, and packaging

Schedule Bridge

284 days

global baseline
FLEX R1.0 Global Baseline
180 days
10 baseline modules
regional MVP
FLEX R1.0 APAC Regional MVP
38 days
10 Regional MVP decisions
approved variants
3 approved variant bundles
30 days
12 variant effects
deployment configuration
Final deployment configuration resolution
36 days
Resolution allowance for final content, revision, and packaging

Sustainability Bridge

1.5 kt CO2e

global baseline
FLEX R1.0 Global Baseline
1.28 kt CO2e
10 baseline modules
regional MVP
FLEX R1.0 APAC Regional MVP
93.7 t CO2e
10 Regional MVP decisions
approved variants
3 approved variant bundles
92.7 t CO2e
12 variant effects
deployment configuration
Final deployment configuration resolution
36.6 t CO2e
Resolution allowance for final content, revision, and packaging