Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.

Procurement View

Preserve the Part to SKU distinction while showing region-specific inventory, supplier coverage, reservations, long-lead exposure, and commonality implications for the selected deployment configuration.

Available stock
2,672
Reserved stock
1,720
On order
2,250
Long-lead SKUs
60
Available value
$548.9m

Procurement Summary

Seeded procurement pack and BOM resolution for the selected deployment configuration.

Deployment configurationFLEX Deployment Configuration 1
ReleaseFLEX R1.1
Regional MVPFLEX R1.1 NA Regional MVP
Procurement packreview
Resolved Parts72
Resolved SKUs108
Applied variant bundlesvariant-emea, variant-msft, variant-speed

Long-Lead and Risk

Regional SKU exposure based on lead time and inventory risk markers.

SKU-00016
PP-0008 · Apex Power Systems
24 weeks
Available 18 · on order 17 · alternate Vertex Modular
SKU-00088
PP-0044 · Apex Power Systems
24 weeks
Available 25 · on order 17 · alternate Vertex Modular
SKU-00160
PP-0080 · Apex Power Systems
24 weeks
Available 25 · on order 17 · alternate Vertex Modular
SKU-00232
PP-0116 · Apex Power Systems
24 weeks
Available 25 · on order 17 · alternate Vertex Modular
SKU-00304
PP-0152 · Apex Power Systems
24 weeks
Available 25 · on order 17 · alternate Vertex Modular
SKU-00376
PP-0188 · Apex Power Systems
24 weeks
Available 18 · on order 17 · alternate Vertex Modular

Supplier View

Supplier grouping preserves SKU-level procurement detail below Parts.

Supplier
Parts served
SKUs
Available
Loaded value
HelioCool
23
23
391
$88m
Northstar Electrical
23
23
402
$80.3m
OmniControls
23
23
341
$75.9m
Vertex Modular
22
22
348
$65.5m
BlueRiver Fabrication
22
22
318
$61.3m
Apex Power Systems
22
22
275
$60.2m
Kinetic Thermal
23
23
300
$59.1m
Atlas Switchgear
22
22
297
$58.6m

Procurement Commonality

Shared content across FLEX and FORGE from a procurement lens.

81%
Fire and Life Safety Module
FIRE_LIFE_SAFETY · Support
shared
$5.78m loaded module cost
Power Distribution Module
POWER_DISTRIBUTION · Power
shared
$5.59m loaded module cost
Structural Kit Module
STRUCTURAL_KIT · Structure
shared
$5.41m loaded module cost
Facility Support Module
FACILITY_SUPPORT · Support
shared
$5.22m loaded module cost
Security and Network Module
SECURITY_NETWORK · Controls
shared
$5.04m loaded module cost
Controls and Telemetry Module
CONTROLS_TELEMETRY · Controls
shared
$4.85m loaded module cost
Backup Generation Module
BACKUP_GENERATION · Power
shared
$4.67m loaded module cost
Medium-Voltage Intake Module
MV_INTAKE · Power
shared
$4.48m loaded module cost

Alternative SKU Analysis By Part

Part-level options compare cost, lead time, available stock, and destination-region eligibility.

Part
Best cost
Fastest
Alternatives
Destination fit
PP-0224
FLEX Heat Rejection Assembly 3 Part 4
SKU-00469
$79.5k · 9 weeks
SKU-00469
9 weeks · $79.5k
4
NA
PP-0217
FLEX Heat Rejection Assembly 2 Part 1
SKU-00441
$76.1k · 17 weeks
SKU-00441
17 weeks · $76.1k
4
NA
PP-0229
FLEX Heat Rejection Assembly 5 Part 1
SKU-00489
$79.5k · 11 weeks
SKU-00489
11 weeks · $79.5k
4
NA
PP-0222
FLEX Heat Rejection Assembly 3 Part 2
SKU-00461
$76.1k · 19 weeks
SKU-00461
19 weeks · $76.1k
4
NA
PP-0215
FLEX Heat Rejection Assembly 1 Part 3
SKU-00433
$78.4k · 9 weeks
SKU-00433
9 weeks · $78.4k
4
NA
PP-0231
FLEX Heat Rejection Assembly 5 Part 3
SKU-00497
$77.3k · 19 weeks
SKU-00497
19 weeks · $77.3k
4
NA
PP-0218
FLEX Heat Rejection Assembly 2 Part 2
SKU-00445
$75k · 21 weeks
SKU-00445
21 weeks · $75k
3
NA
PP-0230
FLEX Heat Rejection Assembly 5 Part 2
SKU-00493
$78.4k · 15 weeks
SKU-00493
15 weeks · $78.4k
3
NA
PP-0214
FLEX Heat Rejection Assembly 1 Part 2
SKU-00429
$79.5k · 23 weeks
SKU-00432
8 weeks · $104.3k
3
NA
PP-0220
FLEX Heat Rejection Assembly 2 Part 4
SKU-00453
$78.4k · 11 weeks
SKU-00453
11 weeks · $78.4k
3
NA
PP-0226
FLEX Heat Rejection Assembly 4 Part 2
SKU-00477
$77.3k · 17 weeks
SKU-00477
17 weeks · $77.3k
3
NA
PP-0232
FLEX Heat Rejection Assembly 5 Part 4
SKU-00501
$76.1k · 23 weeks
SKU-00504
8 weeks · $106.5k
3
NA
PP-0223
FLEX Heat Rejection Assembly 3 Part 3
SKU-00465
$75k · 23 weeks
SKU-00468
8 weeks · $105.4k
3
NA
PP-0216
FLEX Heat Rejection Assembly 1 Part 4
SKU-00437
$77.3k · 13 weeks
SKU-00437
13 weeks · $77.3k
3
NA

Region-to-Region Shipping Penalties

Cross-region penalties are lane-specific for the selected deployment destination.

SKU
Part
Lane
Status
Cost penalty
Lead penalty
SKU-00024
PP-0012
Medium-Voltage Intake Assembly 3 Part 2
APAC to NA
allowed
$17,111
6 weeks
SKU-00048
PP-0024
Medium-Voltage Intake Assembly 5 Part 4
APAC to NA
allowed
$16,929
6 weeks
SKU-00072
PP-0036
Backup Generation Assembly 3 Part 1
APAC to NA
allowed
$17,325
6 weeks
SKU-00096
PP-0048
Backup Generation Assembly 5 Part 3
APAC to NA
allowed
$17,135
6 weeks
SKU-00120
PP-0060
Controls and Telemetry Assembly 2 Part 5
APAC to NA
allowed
$17,508
6 weeks
SKU-00144
PP-0072
Controls and Telemetry Assembly 5 Part 2
APAC to NA
allowed
$18,296
6 weeks
SKU-00168
PP-0084
Security and Network Assembly 2 Part 4
APAC to NA
allowed
$18,684
6 weeks
SKU-00192
PP-0096
Security and Network Assembly 5 Part 1
APAC to NA
allowed
$18,480
6 weeks
SKU-00216
PP-0108
Facility Support Assembly 2 Part 3
APAC to NA
allowed
$18,845
6 weeks
SKU-00240
PP-0120
Facility Support Assembly 4 Part 5
APAC to NA
allowed
$18,633
6 weeks
SKU-00264
PP-0132
Structural Kit Assembly 2 Part 2
APAC to NA
allowed
$20,074
6 weeks
SKU-00288
PP-0144
Structural Kit Assembly 4 Part 4
APAC to NA
allowed
$19,854
6 weeks
SKU-00312
PP-0156
Power Distribution Assembly 2 Part 1
APAC to NA
allowed
$20,212
6 weeks
SKU-00336
PP-0168
Power Distribution Assembly 4 Part 3
APAC to NA
allowed
$19,985
6 weeks