VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.
Back to Land Bank
reservedNorth AmericaUS

Demo Land Parcel 04

121 Technology Gateway Road, Ashburn, VA 20147 · United States. Focused parcel assessment with local utility, airport, hospitality, climate, PUE, and deployment configuration context.

Create deployment configuration
Area
49.2 acres
Grid power
168 MW
On-site power
16 MW
Gas capacity
148 MW
Grid carbon
0.38 kg/kWh
Grid energy emissions
Reliability
3.5 h/yr
strong transmission, queue constrained
Queue
29 mo
Interconnection estimate

Parcel Map

Focused view fitted to the selected parcel boundary with nearby context muted.

Loading local map canvas

Deployment Fit

FLEX and FORGE site efficiency and leaseable IT capacity.

FLEX
122.6 MW
1.190 annual PUE · 1.370 peak PUE
FORGE
124.9 MW
1.155 annual PUE · 1.345 peak PUE

Climate Stress

Cooling design conditions used for heat rejection assumptions.

Aviation and Hotels

Executive access assumptions for site visits and project delivery.

Domestic airport
KJYO
Leesburg Executive Airport
22 km
International airport
KIAD
Washington Dulles International Airport
36 km
Top local hotels
Westfields Marriott Washington Dulles
executive
8 km
Hyatt Regency Dulles
business
11 km
Hilton Garden Inn Dulles North
extended stay
14 km

Power and Gas

Utility infrastructure assumptions for screening and executive comparison.

Grid operator
PJM Interconnection / Dominion Energy
Interconnect voltage
230 kV
Nearest substation
Innovation 230 kV Substation · 7.3 km
Reliability tier
strong transmission, queue constrained
Gas connection
Transco Loudoun Gate Station · 12 km
Estimated gas capacity
148 MW

Location Intelligence

Screening metadata attached to the parcel record.

Address
121 Technology Gateway Road, Ashburn, VA 20147
Country
United States (NA)
Climate profile
humid-temperate / grid constrained
Grid carbon intensity
0.38 kgCO2e/kWh
Interconnection queue
29 months
Expected outages
3.5 hours/year

Deployment Configurations

Configurations already linked to this parcel, or start a new deployment configuration from it.

FORGE Deployment Configuration 4FORGE