VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.
Back to Land Bank
screeningNorth AmericaCA

Demo Land Parcel 13

184 Industrial Parkway, Mississauga, ON L5T · Canada. Focused parcel assessment with local utility, airport, hospitality, climate, PUE, and deployment configuration context.

Create deployment configuration
Area
70.8 acres
Grid power
72 MW
On-site power
13 MW
Gas capacity
160 MW
Grid carbon
0.12 kg/kWh
Grid energy emissions
Reliability
1.6 h/yr
high hydro reserve margin
Queue
20 mo
Interconnection estimate

Parcel Map

Focused view fitted to the selected parcel boundary with nearby context muted.

Loading local map canvas

Deployment Fit

FLEX and FORGE site efficiency and leaseable IT capacity.

FLEX
56.7 MW
1.140 annual PUE · 1.270 peak PUE
FORGE
57.8 MW
1.105 annual PUE · 1.245 peak PUE

Climate Stress

Cooling design conditions used for heat rejection assumptions.

Aviation and Hotels

Executive access assumptions for site visits and project delivery.

Domestic airport
CYTZ
Billy Bishop Toronto City Airport
15 km
International airport
CYYZ
Toronto Pearson International Airport
18 km
Top local hotels
Alt Hotel Toronto Airport
executive
4.5 km
Sheraton Gateway Hotel
business
7.7 km
Hilton Toronto Airport
extended stay
11 km

Power and Gas

Utility infrastructure assumptions for screening and executive comparison.

Grid operator
IESO / Hydro One
Interconnect voltage
230 kV
Nearest substation
Peel 230 kV Transformer Station · 4.9 km
Reliability tier
high hydro reserve margin
Gas connection
Enbridge GTA West Gate · 5.8 km
Estimated gas capacity
160 MW

Location Intelligence

Screening metadata attached to the parcel record.

Address
184 Industrial Parkway, Mississauga, ON L5T
Country
Canada (NA)
Climate profile
cool-temperate / low carbon
Grid carbon intensity
0.12 kgCO2e/kWh
Interconnection queue
20 months
Expected outages
1.6 hours/year

Deployment Configurations

Configurations already linked to this parcel, or start a new deployment configuration from it.

Create deployment configuration from this parcel