VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.
Back to Land Bank
screeningEurope, Middle East, and AfricaIE

Demo Land Parcel 33

324 Grange Castle Business Park, Dublin D22 · Ireland. Focused parcel assessment with local utility, airport, hospitality, climate, PUE, and deployment configuration context.

Create deployment configuration
Area
132.3 acres
Grid power
126 MW
On-site power
13 MW
Gas capacity
150 MW
Grid carbon
0.34 kg/kWh
Grid energy emissions
Reliability
2.2 h/yr
island grid, capacity agreement required
Queue
32 mo
Interconnection estimate

Parcel Map

Focused view fitted to the selected parcel boundary with nearby context muted.

Loading local map canvas

Deployment Fit

FLEX and FORGE site efficiency and leaseable IT capacity.

FLEX
100.8 MW
1.146 annual PUE · 1.250 peak PUE
FORGE
102.9 MW
1.111 annual PUE · 1.225 peak PUE

Climate Stress

Cooling design conditions used for heat rejection assumptions.

Aviation and Hotels

Executive access assumptions for site visits and project delivery.

Domestic airport
EIME
Casement Aerodrome
16 km
International airport
EIDW
Dublin Airport
28 km
Top local hotels
Clayton Hotel Dublin Airport
executive
4.8 km
Maldron Hotel Newlands Cross
business
8.1 km
Louis Fitzgerald Hotel
extended stay
11 km

Power and Gas

Utility infrastructure assumptions for screening and executive comparison.

Grid operator
EirGrid / ESB Networks
Interconnect voltage
220 kV
Nearest substation
Grange Castle 220 kV Substation · 5.3 km
Reliability tier
island grid, capacity agreement required
Gas connection
Gas Networks Ireland West Dublin AGI · 9.3 km
Estimated gas capacity
150 MW

Location Intelligence

Screening metadata attached to the parcel record.

Address
324 Grange Castle Business Park, Dublin D22
Country
Ireland (EMEA)
Climate profile
cool-marine
Grid carbon intensity
0.34 kgCO2e/kWh
Interconnection queue
32 months
Expected outages
2.2 hours/year

Deployment Configurations

Configurations already linked to this parcel, or start a new deployment configuration from it.

Create deployment configuration from this parcel