VVantage Product PlatformShared platform to governed deployment configuration
Local-first demoSeeded SQLite

Navigation

Platform, delivery, performance, reliability, and governance.

Product FamiliesFLEX and FORGE on the shared product platformCommonalityShared and unique platform contentReference BOM150 percent structure, Parts, SKUs, revisionsConfigureBaseline, regional MVP, variants, dials, landLand BankParcel creation, energy assumptions, selectionProcurementSuppliers, long lead, commonality, reservationsInventoryStock, reservation, and drawdown storytellingDeployment ScheduleManufacture, logistics, install, handoverCommissioningReadiness, tasks, dependencies, evidenceOperations / CAFMAsset handover and import previewDigital ThreadTraceability from platform to operationProduct PerformanceCost, schedule, readiness, repeatabilityReliabilityWeak signals, assurance, controls, learningGovernanceRules, deviations, releases, compatibility
Demo data is local and resettable. All views use seeded product, parcel, lifecycle, performance, and reliability records.
electricalstandardFLEX

VDC-ASSET-00049

Cradle-to-grave asset view linking the operations handover record back to deployment configuration, module content, procurement SKUs, schedule, commissioning, CAFM export, and digital thread events.

FLEX Deployment Configuration 1FLEX_UPSDemo Land Parcel 01
Drag orbit · wheel zoom · shift drag pan
Handover
48%
Telemetry
6
Schedule tasks
1
Cx tasks
1
Controls
partial

Module, Parts, and SKUs

FLEX UPS Assembly 1
PP-0201
SKU-00401 · Northstar ElectricalSKU-00402 · HelioCool
PP-0202
SKU-00403 · Vertex ModularSKU-00404 · OmniControls
FLEX UPS Assembly 2
PP-0203
SKU-00405 · BlueRiver FabricationSKU-00406 · Atlas Switchgear
PP-0204
SKU-00407 · Kinetic ThermalSKU-00408 · Apex Power Systems
FLEX UPS Assembly 3
PP-0205
SKU-00409 · Northstar ElectricalSKU-00410 · HelioCool
PP-0206
SKU-00411 · Vertex ModularSKU-00412 · OmniControls

Documents and CAFM Context

VDC-ASSET-00049 installed asset drawing
PDF
VDC-ASSET-00049 maintenance procedure
PDF
VDC-ASSET-00049 commissioning evidence
XLSX
VDC-ASSET-00049 OEM warranty file
PDF
{
  "columns": [
    "assetTag",
    "name",
    "moduleCode",
    "assetClass",
    "maintenanceClass"
  ],
  "rowCount": 66
}

Schedule

functional performance test - FLEX UPS ModuleCommissioning · Nov 16, 2026-Nov 30, 2026

Commissioning

operator training - FLEX UPS ModuleL6 Closeout and Handover · ready

Digital Thread

handover event event 49handover event · complete